feedback
Rate this webpage
Need
Support?

NCP5395T: 2/3/4-Phase Controller with Gate Drivers

Datasheet: 2/3/4-Phase Controller with On Board Gate Drivers for CPU Applications
Rev. 1 (256.0kB)
Product Overview
»View Reliability Data
»View Material Composition
» Product Change Notification
The NCP5395T provides up to a four phase buck solution which combines differential voltage sensing, differential phase current sensing, and adaptive voltage positioning to provide accurately regulated power for both Intel and AMD processors. It also receives power saving command from CPU, and operates in a single phase emulation diode mode to obtain a high efficiency at lightload. Dual edge pulse width modulation combined with precise inductor current sensing provides the fastest initial response to dynamic load events both in power saving and normal modes. Dual edge multiphase modulation reduces the total bulk and ceramic output capacitance required therefore reducing the system cost to meet transient regulation specifications. The on board gate drivers includes adaptive non overlap and power saving operation. A high performance operational error amplifier is provided to simplify compensation of the system. Patented Dynamic Reference Injection further simplifies loop compensation by eliminating the need to compromise between closed loop transient response and Dynamic VID performance.
Features   Benefits
     
  • Dual-Edge PWM
 
  • Faster initial response to transient loading
Applications   End Products
  • Vcore controller
 
  • Desktop PC
Technical Documentation & Design Resources
Data Sheets (1) Package Drawings (1)
Product
Status
Compliance
Description
Package
MSL
Container
Budgetary Price/Unit
Type
Case Outline
Type
Temperature
Type
Qty.
NCP5395TMNR2G Obsolete
Pb-free
Halide free
NCP5395T QFN-48 485AJ 1 260 Tape and Reel 2500  
Market Leadtime (weeks) : Contact Factory
PandS   (2020-09-14 00:00) : >1K
Case Outlines
485AJ   
Application
Diagram - Block
Previously Viewed Products
Clear List

Your request has been submitted for approval.
Please allow 2-5 business days for a response.
You will receive an email when your request is approved.
Request for this document already exists and is waiting for approval.