feedback
Rate this webpage
Need
Support?

NCP781BMN050TAGEVB: NCP781 5V Very High Voltage Tolerant Linear Regulator with Enable Function Demoboard

The demoboard supports the very high−voltage tolerant linear regulator NCP781 in DFN6 3.3 x 3.3 package with fixed output voltage 5.0 V. The ENABLE function allows turn the device to low consumption mode with quiescent current about 1 uA. The device is able to withstand continuous DC or transient input voltages up to 150 V. The small output capacitor 0.1 uF is sufficient for stable behavior and allows smaller PCB design at space constraining applications.

Size: 50mm x 50mm x 19mm
Features and Applications

Features

  • Ideal for Harsh Environments
  • Thermal Shutdown and Current Limit Protection
  • Available in Thermally Enhanced DFN6 3.3 x 3.3, 0.65P Package
  • Very High PSRR: 83/56 dB@1/100 kHz
  • Standby Current: 1 uA
  • Very Low Quiescent Current of Typ. 25 uA
  • Output Voltage Versions: Fixed 5.0 V
  • Wide Input Voltage Range: 6 V to 150 V
  • ±2.5% Accuracy at Room Temperature
  • Stable with a 0.1 uF Ceramic Output Capacitor
  • These are Pb−free Devices

Applications

  • Telecom, Industrial
  • Bias Power Supplies, Led Lighting
Evaluation/Development Tool Information
Product Status Compliance Short Description Parts Used Action
NCP781BMN050TAGEVB Active
Pb-free
NCP781 5V Very High Voltage Tolerant Linear Regulator with Enable Function Demoboard MRA4007T3G NCP781BMN050TAG
Technical Documents
Type Document Title Document ID/Size Rev
Eval Board: BOM NCP781BMN050TAGEVB Bill of Materials (ROHS Compliant) NCP781BMN050TAGEVB_BOM_ROHS - 32 KB  0 
Eval Board: Gerber NCP781BMN050TAGEVB Gerber Layout Files (Zip Format) NCP781BMN050TAGEVB_GERBER - 40 KB  0 
Eval Board: Schematic NCP781BMN050TAGEVB Schematic NCP781BMN050TAGEVB_SCHEMATIC - 213 KB  0 
Eval Board: Test Procedure NCP781BMN050TAGEVB Test Procedure NCP781BMN050TAGEVB_TEST_PROCEDURE - 81 KB  0 
Previously Viewed Products
Clear List

Your request has been submitted for approval.
Please allow 2-5 business days for a response.
You will receive an email when your request is approved.
Request for this document already exists and is waiting for approval.