feedback
Rate this webpage
Need
Support?

NCP45520IMNGEVB: Controlled Load Switch with Ultra-Low Ron Evaluation board


The NCP45520 load switch provides a component and area-reducing solution for efficient power domain switching with inrush current limit via soft-start. In addition to integrated control functionality with ultra low on-resistance, this device offers system safeguards and monitoring via fault protection and power good signaling. This cost effective solution is ideal for power management and hot-swap applications requiring low power consumption in a small footprint.
Features and Applications

Features

  • Advanced Controller with Charge Pump
  • Integrated N-Channel MOSFET
  • Soft-Start via Slew Rate Control
  • Input Voltage Range 0.5 V to 13.5 V (18V Tolerant)
  • Low Standby Current
  • Quick Output Discharge Function (Adjustable)
  • Power Good Signaling
  • Fault Protection: Over Temperature
  • Fault Protection: Under Voltage Lockout
  • Fault Protection: Short-Circuit Protection
Evaluation/Development Tool Information
Product Status Compliance Short Description Parts Used Action
NCP45520IMNGEVB Active
Pb-free
Controlled Load Switch with Ultra-Low Ron Evaluation board NCP45520IMNTWG-H NCP45520IMNTWG-L
Technical Documents
Type Document Title Document ID/Size Rev
Eval Board: BOM NCP45520IMNGEVB Bill of Materials ROHS Compliant NCP45520IMNGEVB_BOM_ROHS - 78 KB  0 
Eval Board: Gerber NCP45520IMNGEVB Gerber Layout Files (Zip Format) NCP45520IMNGEVB_GERBER - 15 KB  0 
Eval Board: Schematic NCP45520IMNGEVB Schematic NCP45520IMNGEVB_SCHEMATIC - 219 KB  0 
Eval Board: Test Procedure NCP45520IMNGEVB Test Procedure NCP45520IMNGEVB_TEST_PROCEDURE - 64 KB  0 
Video Controlled Load Switch with Ultra-Low On-Resistance Evaluation Board - NCP45520IMNGEVB Test Procedure WVD17515/D   
Previously Viewed Products
Clear List

Featured Video
Controlled Load Switch with Ultra-Low On-Resistance Evaluation Board - NCP45520IMNGEVB Test Procedure
Your request has been submitted for approval.
Please allow 2-5 business days for a response.
You will receive an email when your request is approved.
Request for this document already exists and is waiting for approval.