NCP59801MLFIXTCGEVB: NCP59801 WDFNW6 2x2 FIX EVAL BOARD

The demo board supports the PMOS LDO regulator NCP59801 in DFNW8 3 x 3 mm package with fixed output voltage and input voltage in range from 1.6 V up to 5.5 V. It is a 1000 mA very low dropout device equipped with PMOS pass transistor.
The device provides very stable, accurate output voltage with low noise suitable for space constrained, noise sensitive applications. In order to optimize performance for battery operated portable applications, the NCP59801 features low IQ consumption.
The device is available with or without active discharge feature.

Size: 50mm x 50mm x 12mm
Features and Applications

Features

  • Input Voltage Range: 1.6 V to 5.5 V
  • Fixed Output Voltage from 0.6 V up to 5.0 V
  • 1.0% Accuracy over Temperature, 0.7% VOUT @ 25°C
  • Ultra-Low Dropout: Typ. 120 mV at 1000 mA
  • Very Low Bias Input Current of Typ. 35 uA
  • Logic Level Enable Input for ON/OFF Control
  • Output Active Discharge Option Available
  • Stable with a 4.7 uF Ceramic Capacitor
  • Available in DFNW8 3 mm x 3 mm x 0.75 mm Package
  • This is a Pb-Free Device

Applications

  • This is a Pb-Free Device
  • In-Vehicle Networking
  • Telematics, Infotainment and Clusters
  • General Purpose Automotive
Evaluation/Development Tool Information
Product Status Compliance Short Description Parts Used Action
NCP59801MLFIXTCGEVB Active
Pb-free
NCP59801 WDFNW6 2x2 FIX EVAL BOARD NCP59801CML330TCG
Technical Documents
Type Document Title Document ID/Size Rev
Eval Board: BOM NCP59801MLFIXTCGEVB Bill of Materials (ROHS Compliant) NCP59801MLFIXTCGEVB_BOM_ROHS - 211 KB  0 
Eval Board: Gerber NCP59801MLFIXTCGEVB Gerber Layout Files (Zip Format) NCP59801MLFIXTCGEVB_GERBER - 66 KB  0 
Eval Board: Schematic NCP59801MLFIXTCGEVB Schematic NCP59801MLFIXTCGEVB_SCHEMATIC - 30 KB  0 
Eval Board: Test Procedure NCP59801MLFIXTCGEVB Test Procedure NCP59801MLFIXTCGEVB_TEST_PROCEDURE - 137 KB  0 
Previously Viewed Products
Clear List

Your request has been submitted for approval.
Please allow 2-5 business days for a response.
You will receive an email when your request is approved.
Request for this document already exists and is waiting for approval.