Product Change Notification
| Change Notification # |
|
16821 |
| Revision |
|
|
| Type of Notification |
|
FINAL PRODUCT/PROCESS CHANGE NOTIFICATION |
| Change Title |
|
Final Notification of the Transfer of LS50 HDPL Die Manufacturing from ON Semiconductor AIZU Fab to ON Semiconductor CZ4 (Tesla) Fab due to Aizu Fab closure. |
| Issue Date |
|
2012-03-27 |
| Affected Product Family |
|
|
| Description |
|
This document depicts the transfer and qualification of the LS50 HDPL process from the ON Semiconductor AIZU facility (Japan) to the ON Semiconductor CZ4 facility (Tesla). The CZ4 Tesla site is certified according to ISO/TS16949 standards.
Devices were qualified to achieve same electrical and reliability performances as the AIZU wafer fab. A full electrical characterization over the temperature range was performed for each product to check the device functionality and electrical specifications. Qualification tests were designed to show that the reliability of transferred devices will continue to meet or exceed ON Semiconductor standards.
|
| Key Items Affected by Change |
|
ON Semiconductor wafer fab site |
| |
| Key Milestones |
|
| Effective Date: |
|
2012-07-01 |
| Sample Info: |
|
Contact your local ON Semiconductor Sales Office. |
| Possible Replacements |
|
N/A |
For more information on this Process Change Notification, please
contact your local ON Semiconductor sales office.
|
|